Antioch Design & Build · Bay Area · CSLB 1156115

Predictable by design.

Remodels, ADUs, new homes, and commercial projects across the Bay Area.

01 · New homes

New homes.

Permits, inspections, and the schedule, in writing.

02 · Kitchens

Kitchens.

A fixed price, set after design.

03 · Baths

Baths.

A written schedule, with a start date and a finish date.

04 · Exteriors

Exteriors.

Stucco, siding, concrete, and landscape, under one contract.

05 · ADUs and additions

ADUs and additions.

A written update every week, until it is done.

06 · Commercial

Your project, in writing.

Price, schedule, and payments are set on paper before work starts. Then you hear from us every week until it is done.

Skip the tour

Antioch Design & Build · Bay Area · CSLB 1156115

Predictable by design.

Remodels, ADUs, new homes, and commercial projects across the Bay Area. A fixed price, a written schedule, and an update every week.

Kitchen with green cabinets and white tile
Kitchens
Bathroom with a walnut vanity and a tiled glass shower
Baths
Small white backyard cottage
ADUs and additions
New two-story home with a backyard cottage
New homes
Before work starts

What you get in writing

Five documents. Signed before we start.

Most remodel stress comes from not knowing. What it costs. When it ends. Who to call. We put the answers on paper first, and both sides sign.

  1. 01

    Fixed-price scope

    Every room, every material, every task, with one total. After design is done, that total is the price.

  2. 02

    Schedule

    A start date and a finish date, with the steps between them. It goes in the contract.

  3. 03

    Payment schedule

    Payments are tied to finished milestones. You never pay ahead of the work.

  4. 04

    Change order policy

    The price changes for two reasons only: you ask for something new, or we find a hidden problem and show you photos. Either way it is priced, written, and signed before extra work starts.

  5. 05

    Two-year warranty

    Our workmanship is covered for two years, in writing.

All five are part of your construction contract. You sign it only after design is done and you have seen the fixed price.

SAMPLE

Weekly update · Week 6 of 11

Done this week
Cabinets set and leveled. Rough electrical passed city inspection.
Next week
Countertop template on Tuesday. Tile starts Thursday.
Decisions due
Cabinet hardware finish, by Friday.
Budget
On contract. No open change orders.

This is a sample, not a real project. It shows the format of the update you get from us every week.

Step by step

The process

Five steps. You always know the next one.

  1. Project call

    A 20-minute phone call. You tell us about the house and what you want. We tell you honestly if we are a fit.

    You get
    A plain answer and a site visit date.
    You pay
    Nothing.
  2. Site visit and range

    We walk the space, measure, and look at what an older house may be hiding.

    You get
    A written cost range for your project.
    You pay
    Nothing.
  3. Design and fixed price

    You sign a short design agreement first. We design the space with you and choose every material. Then we price the exact plan.

    You get
    Drawings, selections, and a fixed price.
    You pay
    A flat design fee, quoted in writing before design starts.
  4. Build

    You sign the fixed-price construction contract, with all five documents inside. Then permits, demolition, construction, and city inspections.

    You get
    A written update every week.
    You pay
    Milestone payments, as each stage is finished.
  5. Walkthrough and warranty

    We walk the finished job together and fix anything on your list.

    You get
    Your two-year written warranty.
    You pay
    The final payment, after the walkthrough.

Most kitchens take 12 to 20 weeks from first call to final walkthrough. Most baths take less. City permit review is the one part nobody controls, so it goes on the schedule from day one.

Demolition day

Older homes

What if you open the wall and find a problem?

In a Bay Area house built before 1980, sometimes we will. Here is the plan for that day, decided before it comes.

Old wiring

Knob-and-tube or cloth wiring that is not safe to bury again.

Old pipes

Galvanized or cast iron lines near the end of their life.

Water damage

Rot in the subfloor or framing from a slow leak.

Same steps every time. We stop. We show you photos. We price the fix in writing. You sign. Then we continue.

We name the likely risks for your house at the site visit, so you can plan for them before work starts.

The number

Typical costs

Real numbers, before you call.

These are typical 2026 ranges for the Peninsula and nearby Bay Area cities. Your own fixed price comes from your design, not from this table.

Finished kitchen detail in afternoon light

Kitchens

RefreshSame layout, new surfaces$25K to $55K
Full remodelNew cabinets, counters, and lighting$65K to $120K
Custom or structuralWalls moved, custom cabinetry$120K to $220K and up
Finished bathroom detail in afternoon light

Baths

RefreshSame layout, new surfaces$15K to $30K
Full remodelNew tile, fixtures, and vanity$30K to $65K
Custom or full gutNew layout, down to the studs$65K to $120K and up
Small white backyard cottage in afternoon light

ADUs

Garage conversionAn existing garage becomes a home$150K to $280K
Attached ADUAn addition with its own entrance$220K to $350K
Detached ADUA new backyard cottage$300K to $450K and up

Construction only. Design is a separate flat fee, and city fees are extra.

New two-story white stucco home with a cedar garage door and a fenced front yard

New construction

Teardown and rebuildA 2,500 sq ft home on the lot you own, $550 to $800 per sq ft$1.4M to $2M
Custom home3,500 sq ft with high-end finishes, $650 to $950 per sq ft$2.3M to $3.3M and up
AdditionA 500 sq ft ground-floor room with a bath, $400 to $650 per sq ft. Second stories cost more.$200K to $325K and up

What you pay us to build, 2026 Peninsula ranges. It covers tearing down the old house, the foundation, and connecting to utilities at your property line. Land is not included. Design, engineering, permits, and city and school fees usually add 15 to 25 percent. Asbestos removal, if testing finds it, and utility company charges are priced after we see the site.

Finished neighborhood restaurant interior in afternoon light

Commercial projects

Office or shop build-outA 3,000 sq ft leased space is about $450K to $825K$150 to $275 per sq ft
Restaurant or cafe2,000 sq ft is about $400K to $1.2M and up. The low end reuses a hood and grease trap already in place.$200 to $600 per sq ft and up
Small new building5,000 sq ft with basic interiors is about $2M to $3.5M before site work$400 to $700 per sq ft and up

What you pay us to build, 2026 Bay Area ranges, before design, permits, city and utility fees, site work, furniture, IT, and cooking or medical equipment. The hood, fire suppression, and grease trap are part of the build. Medical and dental suites run about $250 to $500 per sq ft.

Every number above is a range. Your own price is fixed after design, in writing.

What moves the number

  • Moving plumbing, gas, or walls.
  • Cabinets: semi-custom or fully custom.
  • The age of the house and what is behind the walls.
  • Your city's permit fees and review time.

How you pay

Deposit

$1,000 or 10 percent of the contract, whichever is less. That is California law.

Design

A flat fee, separate from construction, quoted in writing first.

Progress payments

Tied to finished milestones. Never ahead of the work.

Changes

Priced, written, and signed before extra work starts.

The look

Styles we build

Your style, not ours.

Green, white, walnut, oak, terracotta. We build what you pick. Here are a few of the looks Bay Area homeowners and business owners are choosing right now.

Kitchen with a dusty blue island, warm white cabinets, a range and hood
KitchenDusty blue island, warm white cabinets
Two-tone kitchen with walnut cabinets, white uppers, and a walnut island
KitchenWalnut and white, two-tone
Sage green kitchen with a plaster range hood, quartzite island and white oak cabinet wall
KitchenSage green, quartzite, and white oak
Modern white oak kitchen with a plaster range hood and a stone island
KitchenWhite oak and stone, plaster hood
Bathroom with a white oak double vanity and arched mirrors
BathWhite oak double vanity, limestone-look tile
Small powder room tiled in terracotta
Powder roomTerracotta zellige
Primary bath with a blue-green tiled shower, floating walnut vanity and a freestanding tub
BathBlue-green tile, floating walnut vanity
Backyard cottage with olive green board siding and an oak front door
ADUOlive green siding, oak front door
A former garage converted into a small home
Garage conversionA garage becomes a home
New two-story white stucco home with a metal roof, a cedar wing and a cedar garage door
New homeModern farmhouse: white stucco, cedar, metal roof
The same new home in Spanish revival style with a clay tile roof, arched windows and shutters
New homeSpanish revival: clay tile, arches, shutters
The same new home in Craftsman style with shingle siding, a deep porch and tapered columns
New homeCraftsman: shingles, deep porch, tapered columns
The same new home in mid-century modern style with post and beam framing, clerestory glass and redwood siding
New homeMid-century modern: post and beam, clerestory glass
The same new home in a contemporary dark style with charcoal metal siding, cedar accents and black steel windows
New homeContemporary: charcoal metal, cedar, black steel
Finished neighborhood restaurant with white oak banquettes, a blue-green tile bar and brass pendants
RestaurantOak banquettes, blue-green tile bar
Small finished cafe with a white oak counter, plaster walls and a black steel storefront
CafeOak counter, plaster, steel storefront
Finished office tenant improvement with a white oak reception desk and glass partitions
Tenant improvementOak reception, glass partitions, slat ceiling

Illustrative renderings of styles we build, not completed Antioch projects.

Commercial

Commercial work

We build commercial spaces too.

Restaurants, cafés, retail, offices, and small medical and dental suites across the Bay Area. Tenant improvements, build-outs, and small ground-up buildings. The same fixed price, written schedule, and weekly update, plus the extra steps commercial work needs.

Tenant improvements

A shell or a tired space turned into your business. Layout, finishes, lighting, and the HVAC, plumbing, and power sized for the use.

Restaurants and cafés

Hoods, grease interceptors, and health department sign-off, with the fire and accessibility checks that come with serving the public.

Offices, retail, and clinics

Storefronts, partitions, ceilings, data, and accessible restrooms, built around your opening date.

How a commercial job runs with us

  • Permits and plan check with the city, handled by us.
  • Health, fire, and accessibility inspections on the schedule from day one.
  • After-hours and phased work when the space has to stay open.
  • Landlord work letters and lease deadlines written into the contract.

Typical 2026 ranges for offices, shops, restaurants, and small new buildings are in Typical costs. Your own range comes in writing after the site visit, and a fixed price after design.

Book a project call

Week by week

The difference

The usual remodel, and ours.

The usual way

With Antioch

A one-page bid with a round number.

A line-by-line scope with a fixed price.

The price climbs once the walls are open.

The price moves only with a signed change order.

You chase the contractor for news.

A written update reaches you every week.

Big payments up front.

A legal deposit, then payments for finished work.

About two months, said out loud.

Start and finish dates in the contract.

Signed by
A newly built warm white modern home with an oak front door in afternoon light

Who is accountable

One name on the contract.

Antioch Design & Build is a licensed, bonded, and insured California general contractor. Shayne Chun signs your contract and answers for the work.

By conversation

Commercial interiors.

We take on select commercial interior projects. Same documents. Same weekly update. Same fixed price after design.

Talk to us about a commercial project
Before you sign

Questions

Straight answers.

Fair question. Do not take our word for it. Check our license on the state website. Read the contract before you sign. Your deposit is capped by law, and after that you only pay for finished work, so you are never far ahead of us. As jobs finish, real photos and client references will go up on this site.

Two agreements, at two different times. First, a short design agreement with a flat fee. It covers drawings and material choices, it does not commit you to build with us, and the drawings are yours to keep. Second, after design is done and you have seen the fixed price, the construction contract. The five documents are part of it.

Because it is priced from a finished design, not a guess. Every material and task is listed. After you sign, the total moves only with a change order that you also sign.

We stop, show you photos, and price the fix in writing. Nothing extra starts until you sign. Older Bay Area homes often hide old wiring, old pipes, or water damage, so we talk about those risks at the site visit, before you commit.

For construction, the deposit is $1,000 or 10 percent of the contract price, whichever is less. That is California law for home improvement jobs. The flat design fee is separate, and it is quoted in writing before design starts.

Most kitchens run 12 to 20 weeks from the first call to the final walkthrough, including design, ordering, and permits. Baths are usually shorter. Your contract lists a start date and a finish date.

We do. We prepare the drawings, file with your city, and meet the inspectors. Review times differ by city, and we build that time into your schedule.

Most clients do for a bath. For a kitchen, plan on several weeks without a working kitchen. We seal off the work area, keep a clear path through the house, and clean up at the end of each day. Your weekly update tells you what is coming, so you can plan around the loud and dusty days.

Not by itself. What changes is who is responsible. One company designs to your budget, then has to build what it drew at the price it quoted. If you already have an architect or designer, we are glad to build from their plans.

Day one

Start here

Book a project call.

Twenty minutes, no cost, no pressure. We reply within one business day.

About the project

Step 1 of 2
What are you planning?
When would you like to start?
Budget range